Thursday, February 28, 2019
Steel Structure
Most structural brand failures happen at connections. where a beam connects to a newspaper column, where a joist connects to a beam, where a hanging celestial pole connects to a beam (the Kansas City Hyatt discussed above). The geomorphological Engineer must excogitation the design the poise members and give guidelines for the connections. Many people in the twirl Industry dont understand, though, that the Structural Engineer rarely designs the connections. Why is that?Historic eachy, the Steel Fabricators genuine many different airs to make connections. What one Fabricator did in his shop economically might have been quite an expensive way to do it in a competitors Fabrication Shop. So the practice authentic that the Structural Engineer would size the members, but the Steel Fabricators would design the connections, which the Structural Engineer should then review and approve. If you think that seems like a tangled system prone to error, youd be correct.But that is the sys tem we generally have in American construction. So the Construction executive program should know some function about steel connections and have an idea if they are being installed correctly. A bit of understate in Basic Structural Design is helpful, but the main thing to understand is the concept of pin connections versus pertinacious connections. A beam bolted to a column with clip angles along the beam web likely creates a pin connection.This means that the beam shouldnt be able to move up or down, nor in or out, but it can rotate a bit. A steel column bolted to a concrete pier with quatern anchor bolts besides typically creates a pin connection. Again the steel column wont go up, down or sideways, but it may be able to rotate a bit. The fixed connection must closedown that ability to rotate. So for a beam to have a fixed connection to a column, along with clip angles, there may be a plate on the top and bottom flanges of the beam that gets welded to the column.With all tha t welding, the beam can no longer rotate. If a steel column is buried four feet deep in a concrete pier, it also would not be rotating at the point that it exits from the concrete. So those are a couple of ways to create fixed (or moment resisting) connections. The Construction Supervisor should be aware if any fixed (or moment resisting) connections are necessitate and understand how they are to be made. Just asking the questions increases the likelihood of a successful project.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment